Flat submersible pump with built-in 3-positions electric float

MODEL: GFS 401 S
MANUFACTURER:
Clear

Submersible pump with built-in 3 positions electric floater with 10m cable.

Automatic switch-off via integrated electronic control,  integrated check valve, sensor switch fixation in 3 positions, and continuous operation.

Ideal for draining flat surfaces. For pumping from tanks or cisterns.

Please select product code
Expression of Interest Form

In case you are a professional, fill in the name of your company.









    * Obligatory fields

    I have read and agree to the Terms of Use and Privacy Policy.

    Specifications
    • Pump body: ABS/PPO plastic.
    • Impeller material: Noryl.
    • Moter head: Copper.
    • Shaft: Stainless steel AISI-304.
    • Max flow: 7.000Lt/h.
    • Max suction height: 8m.
    • Max immersion depth: 7m.
    • Solid material passage: 1mm.
    • Outlet diameter: 1½”.
    • Voltage: 230V/50Hz.
    • IP protection: X8 – Overload protection, integrated non-return valve, automatic shutdown.
    • Cable length: 10m.
    • Dimensions (LxWxH): 280 x 280 x 200mm.
    • Usage: pure water.
    Dimensions & Performances

    You may also be interested in…