13128

Submersible 2-exits pump with float

MODEL: ELD500-2S
MANUFACTURER:
Clear

Submersible electric pump 500W, for wastewater with double delivery port.

Plastic pump body and impeller. Motor with copper winding. Equipped with a floating float, it develops a maximum head of up to 7 meters with a flow rate of 200 Lt/min.

Cable length 10 meters. Maximum immersion is 6 meters.

Ideal for emptying tank cellars.

Solid passage 35mm.

Please select product code
Expression of Interest Form

In case you are a professional, fill in the name of your company.









    * Obligatory fields

    Specifications
    • Pump body: ABS plastic.
    • Solid material passage: 35mm.
    • Outlet diameter: 1″ – 1¼”.
    • Moter head: Copper.
    • Voltage: 230V/50Hz.
    • Usage: impure water.
    Dimensions & Performances

    You may also be interested in…